Sagemont Upper School-Weston, FL

Sagemont Upper School is an innovative college prep Middle School and High School Facility in the great city of Weston.

Exterior Stucco & Interior Drywall Package.

UM Richter Library Tower

This 7-story Stair Tower Structure to UM’s Richter Library has become a gateway to new technologies which give UM students exceptional opportunities to work in a highly innovative learning environment.

Exterior Stucco Package & EIFS Package.

Buena Vista Elementary

This Elementary School consisted of five 2-story structures and is located in Miami, Miami-Dade County, FL.

Exterior Stucco Package.

Memorial Hospital MOB – Miramar, FL

This 4-story Medical Office Building with Porte Cochere addition to Memorial Hospital Miramar, compliments an outstanding healthcare facility full of great amenities and services.

Exterior Stucco Package & EIFS Bands. This was a $320K contract value for Master Plaster.

Plaza 57 at Sunset Place

This 4-story Office Building & Parking Garage is conveniently located a few blocks away from The Shops At Sunset Place in Miami, FL.

Exterior Stucco Package. This was a $245K contract value for Master Plaster.

Mary Brickell Village

This project includes an 8-story Parking Garage, A Publix and five 2 to 3-story Retail Buildings joined by covered walkways and patios.  It takes up approximately two city blocks and is located in the heart of Brickell in Miami-Dade County, FL.

Exterior Stucco Package, EIFS & Interior Drywall Package . This was a $3.7Mil contract value for Master Plaster.

Dan Marino Ambulatory – Weston, FL

This 2-story building was developed between Dan Marino Foundation & Miami Children’s Hospital for the treatment of children with special needs and is located in Weston, FL.

Exterior Stucco Package & EIFS Bands.

Westside Regional Medical Center

This project consisted of the renovation and addition to the existing healthcare facility in Plantation, FL.

Exterior Stucco Package.